Every winter, vapor recovery units fail in the same few ways: condensate freezes where it collected, trace heating quietly stopped working in autumn, and someone started a stiff vacuum pump too hard. A pre-winter service pass plus a small set of habits keeps the unit running until spring.

Winter Readiness for Vapor Recovery Units: Freeze Protection, Trace Heating and First Cold Snap

Draining Before the Freeze

Condensate collects at separator bodies, collection pots and low-point drains, and every one of those becomes an ice plug below zero. Drain the system fully before first frost, then keep a daily drain habit through the cold months; a drain valve cracked slightly open with a catch container beats an ice block discovered by a pressure alarm. Transfer recovered liquid out of collection tanks on schedule rather than letting it sit through a cold snap.

Trace Heating and Insulation

Electric trace heating keeps vapor lines above freezing, but only when it works. Walk the runs and check for damage, verify connections are sealed against water, and confirm the controller settings suit the lines it protects. Wet insulation is worse than none: it freezes into a jacket that hides the problem while blocking the heat. Repair insulation before the weather that tests it.

Gentle Starts in Cold Oil

Vacuum pump oil thickens as it cools, and a cold start at full load runs high current through stiff clearances. Hand-turn the pump to confirm it moves freely, allow any pre-heat provision, then run unloaded for a few minutes before the unit takes on duty. Change oil before winter per running hours, using the cold-grade oil the pump manufacturer specifies, and record the change.

The Pre-Winter Service Pass

In late autumn, one planned session covers the season: drain, test trace heating, service the pump oil, exercise drain valves, verify gauge accuracy and run a start-stop cycle on the controls. File the record, and repeat the walk after the first real cold snap to catch what the first freeze revealed. Spring brings the mirror-image check when the thaw refills lines with meltwater.

Task When Point
System drain Before first frost, then daily Every low point
Trace heating Pre-winter and monthly Damage, wet insulation
Pump oil Pre-winter Cold-grade, hours logged
Controls check Pre-winter Start-stop cycle verified

Frequently Asked Questions

Is lower recovery in winter a fault?

Vapor generation drops with temperature, so recovered volume falls too; compare with the same month last year before diagnosing equipment.

How should a frozen line be thawed?

Isolate it and thaw slowly with heat tracing or warm water; never with an open flame anywhere near fuel vapor.

What about the collection tank over winter?

Keep it transferred down; a tank of liquid through a hard freeze risks ice expansion and a spring of repairs.

Does VOHON support winter operation of its units?

Yes. VOHON provides vapor recovery units with seasonal operation guidance; reach the team at lixiang@vohon.cn.

目录

VOHON

After-Sales Service & Contact

  • Phone / WeChat +86 135 2699 0215
  • Manufacturer Luoyang Wohong Petrochemical Equipment Co., Ltd.
  • Address W2-1, Dongda Science & Technology Park, Luoxin Industrial Cluster, Xin’an County, Luoyang, China
Response commitment: For warranty claims and urgent faults, our team responds promptly — remote guidance first, then on-site service or parts replacement as required by the warranty terms.

VOHON — Luoyang Wohong Petrochemical Equipment Co., Ltd.

This policy is for general information and may be updated as the product evolves. The version supplied with your unit at the time of delivery prevails.

Sister site: Underground Composite Fuel Piping Systems? Visit Vohon Petrochemical
滚动至顶部