A service station vapor recovery system is not one device; it is a chain of three stages, each capturing vapors at a different point. A stage-3 unit is only part of the picture, and its performance depends on the other stages working correctly.

Stage-1: unloading recovery

When a tanker unloads fuel into an underground tank, the incoming liquid displaces an equal volume of vapor. In a stage-1 system, that vapor is routed back into the tanker through a separate vapor line, so it is not released into the air. The vapor line connection and the tanker’s vapor recovery equipment make this a closed loop.

Stage-2: refueling recovery

During refueling, vapors displaced from the vehicle tank are captured at the nozzle. The system uses a vapor-tight nozzle and a vacuum to pull vapors back into the underground tank. The key setting is the air-to-liquid ratio — typically 1:1 to 1.2:1, meaning for every liter of fuel dispensed, roughly one liter of vapor is captured. If the ratio is set too low, vapors escape; if too high, air is drawn into the tank, increasing tank pressure.

Stage-3: tank vapor treatment

Even with stages 1 and 2 working well, vapors still accumulate in the underground tank. Sources include: vapor that is drawn into the tank during stage-2 capture, temperature-driven tank breathing (the tank inhales and exhales as temperature rises and falls), and pressure variations from filling. These accumulated vapors must be handled — a stage-3 vapor recovery unit is installed on the tank vent line to treat them.

Stage-3 is where the WHSH-M fits. Its job:
– Keep tank pressure near atmospheric (start at the preset pressure, stop at the preset stop pressure)
– Recover hydrocarbons from the tank vapor and return them to the tank as liquid
– Discharge the remaining air at a concentration far below the emission limit
– Operate automatically and continuously without staff attention

Practical notes for correct operation

The pressure/vacuum valve settings matter. Typical settings are +2 to +3 kPa on the pressure side and -1.5 to -2 kPa on the vacuum side. These settings coordinate the tank’s breathing with the stage-3 unit’s start/stop points.

The unit’s start and stop pressures are configurable in the system settings. In practice, stations commonly use a start pressure around 200–300 Pa and a stop pressure around 100 Pa, so the unit runs only when the tank actually needs pressure relief. During tanker unloading, the unit continues to operate normally — no action is required from the staff.

One point worth repeating: stage-3 performance cannot compensate for a poorly maintained stage-1 or stage-2 system. The three stages are designed as a chain. A leak in the stage-2 system, for example, draws air into the tank, which increases the vapor load the stage-3 unit must process.

For more information: +86 135 2699 0215 / lixiang@vohonoilpipe.com

=====================================================================

目录

VOHON

After-Sales Service & Contact

Response commitment: For warranty claims and urgent faults, our team responds promptly — remote guidance first, then on-site service or parts replacement as required by the warranty terms.

VOHON — Luoyang Wohong Petrochemical Equipment Co., Ltd.

This policy is for general information and may be updated as the product evolves. The version supplied with your unit at the time of delivery prevails.

滚动至顶部