Winter Startup for Vapor Recovery Units: Condensate, Heating and First Unload Checks

The first cold weeks expose vapor recovery units to conditions the summer log never recorded. Condensate behaves differently, seals stiffen and the first unloads of the season deserve closer attention than routine ones.

Condensate Systems Before Freezing Weather

Drain condensate pots and check heat tracing on lines that carry liquid hydrocarbons. A frozen drain valve masks a full pot until the unit backs up. Insulation that looks fine in autumn may hide wet spots that freeze through in January; squeeze-test it during the pre-season walk.

Heater and Temperature Settings

Where the unit carries heated components, verify setpoints against the winter commissioning sheet rather than the summer one. Startup current draws more from cold heaters, so check breaker sizing if settings changed over the year.

First Unload Observations

Watch the first truck unload of the season from start to finish. Vacuum cycling that ran smoothly in October may hunt in December as vapor density changes. Record vacuum setpoints, cycle counts and recovery tank rise, then compare against the same data from spring.

Membrane Modules in Cold Weather

Membrane performance shifts with feed temperature. Pressure readings that were normal in summer can sit at the edge of the recommended band in winter. Adjust valve positions gradually and log the new baselines so the crew recognizes seasonal drift rather than mistaking it for membrane aging.

Building the Winter Log

Winter operation rewards record keepers. A short daily line of temperatures, pressures and cycle counts lets the service technician separate weather effects from wear when spring maintenance comes around.

目录

VOHON

After-Sales Service & Contact

  • Phone / WeChat +86 135 2699 0215
  • Manufacturer Luoyang Wohong Petrochemical Equipment Co., Ltd.
  • Address W2-1, Dongda Science & Technology Park, Luoxin Industrial Cluster, Xin’an County, Luoyang, China
Response commitment: For warranty claims and urgent faults, our team responds promptly — remote guidance first, then on-site service or parts replacement as required by the warranty terms.

VOHON — Luoyang Wohong Petrochemical Equipment Co., Ltd.

This policy is for general information and may be updated as the product evolves. The version supplied with your unit at the time of delivery prevails.

Sister site: Underground Composite Fuel Piping Systems? Visit Vohon Petrochemical
滚动至顶部